Friday, 20 April 2007

Made Frame.


Alot was done slowly over the months. Flash (Mould Join) lines have to be sanded down and blended in with 800 wet n dry grit through to 2000 grit.



I built a frame on wheels to rest the body on and be at a comfortable working height.




5ft wide by 8ft long seemed to be enough with the trestles screwed to it.
Works fine.

No comments: